Electronics and IT Minister Ashwini Vaishnaw launched the Semicon 2.0 web application portal on 6 November 2026 and announced approval of 12 more applicants under the Electronics Component Manufacturing Scheme, ECMS.

Figures for the New Approvals

ItemFigure
New approvals12 applications
Projected investment₹7,503 crore
Projected production₹39,045 crore
Expected direct jobs7,127
Seven statesGujarat, Karnataka, Madhya Pradesh, Maharashtra, Punjab, Tamil Nadu, Uttar Pradesh
Total approvals to date118 applications, 34 products, 16 states; investment ₹77,051 crore, output ₹5,73,146 crore, jobs 81,755

Previously, 106 applications involving ₹69,548 crore investment had been approved.

What Will Be Manufactured?

  • Four components: multilayer PCBs, relays, heat sinks and specialised ceramics.
  • Five supply-chain products: copper foil, anode materials, cathode active materials, polypropylene film and camera rims.
  • Capital goods: precision moulds and tooling, control systems and factory-automation equipment.

Copper foil, cathode active materials and specialised ceramics received their first ECMS approvals. Copper foil is an important input for PCB copper-clad laminates and lithium-ion cells.

Semicon 2.0

  • The Union Cabinet approved Semicon 2.0 under the India Semiconductor Mission with an outlay of ₹1,27,500 crore.
  • Its six pillars are chip design; machinery and materials; more fabs; the ATMP/OSAT industry; research and development; and talent development.
  • The portal accepts applications for pillars 2, 3 and 4.
  • Semicon 1.0 approved 12 projects across six states; five had begun commercial production by October 2026.

Way Forward

  • Build value chains beyond assembly into modules, components and materials. Timely implementation is the test.
  • Approvals concern projected investment and output. Publish quarterly actual progress.
  • States need power, water, skilled workers and logistics.
  • Continue R&D and skills investment to reduce dependence on imported raw materials and capital goods.

Prelims Practice Questions

Question 1. Consider these statements about recent ECMS approvals:

Statement 1: They cover 12 applications with projected investment of ₹7,503 crore.

Statement 2: Projects span seven states.

Statement 3: Total approved applications have now reached 106.

Which are correct?

(a) 1 and 2 only

(b) 2 and 3 only

(c) 1 and 3 only

(d) 1, 2 and 3

Answer and Explanation

Answer: (a). The total is now 118. The earlier total was 106, so Statement 3 is wrong.

Question 2. Consider these two statements:

Statement-I: Copper foil is an important input for copper-clad laminates and lithium-ion cells.

Statement-II: Copper foil, cathode active materials and specialised ceramics received their first ECMS approvals.

Which option is correct?

(a) Both statements are correct, and Statement-II correctly explains Statement-I.

(b) Both statements are correct, but Statement-II does not correctly explain Statement-I.

(c) Statement-I is correct, but Statement-II is incorrect.

(d) Statement-I is incorrect, but Statement-II is correct.

Answer and Explanation

Answer: (b). The first describes utility, the second approval sequence. Both are correct, but the latter does not explain the former.

Question 3. Consider these statements about Semicon 2.0:

Statement 1: Its financial outlay is ₹1,27,500 crore.

Statement 2: It focuses on six strategic pillars.

Statement 3: Applications have opened for all six pillars.

Which are correct?

(a) 1 and 2 only

(b) 2 and 3 only

(c) 1 and 3 only

(d) 1, 2 and 3

Answer and Explanation

Answer: (a). Applications are open only for pillars 2, 3 and 4, making Statement 3 incorrect.

Sources

PIB, Semicon 2.0 portal and 12 approved ECMS applicants, 6 November 2026.

Download This Article: PDF

PCSMANTRA

PCSMANTRA Editorial Team

Research and Editing

We prepare current affairs analysis, exam updates and study material in Hindi and English for UPSC, State PCS, PCS-J and other competitive examinations. Every article is verified against official sources before publication; sources are listed at the end of each article.

Read our editorial policy